Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84069 REL 32: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Project Number:
Title:
Pend Oreille River Basin Initiative: Land Acquisitions, Watershed Restoration, Conservation Hatchery
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
84069 REL 32
Contract Title:
2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Continuation:
Previous: Next:
84069 REL 21: 2011-018-00 EXP PEND OREILLE RIVER BASIN INITIATIVE
Contract Status:
Issued
Contract Description:
This project supports implementing larger-scale projects to improve local watershed health and ecosystem conditions and function within the Pend Oreille subbasin, consistent with the NPCC Sub-Basin Plan. The Kalispel Tribe has a history of matching & leveraging funds from various sources (e.g. SRFB, DOE, DOT, BIA, USFS) to implement large scale watershed projects. Land management and watershed restoration will be based upon the jointly-developed objectives and expected performance outcomes.

In previous years contracts (2016-2019) the USGS examined thermal heterogeneity across space and time and identified potential cold-water refuges for salmonids in the Pend Oreille River. The USGS had specific objectives:
1. Continue to compare longitudinal patterns of water temperature derived from thermal infrared imagery to in-stream measurements in the
     water column.
2. Continue to assess spatial (lateral, longitudinal, and vertical) and temporal thermal heterogeneity in water temperature at multiple scales.
3. Continue to evaluate statistical associations between hydrologic and geomorphic variables and occurrence of cool-water areas.
4. The USGS and a Tribal Contractor have provided a cold-water refuge protection and restoration framework (attached). The framework will
     help prioritize areas for protection and potential enhancement of cold-water refuges in the Pend Oreille River.

Based on the framework, the Kalispel Tribe of Indians, Natural Resources Department (KNRD) hired a qualified design engineering team (Northwest Hydraulic Consultants) for the planning, design, and permitting for 2 sites that are part of a temperature refuge enhancement project located north of Newport, Washington: Indian Creek mouth and springs in the vicinity of Duncan Lake/Springs. This planning and design has been completed and gone through ISRP and BPA review. In 2022, implementation of the cold water refugia project took place and was completed at the mouth of Indian Creek.  For this contract year, additional cold water refugia projects will be identified as potential areas to enhance for future design (2024) and implementation (2025).
Account Type(s):
Expense
Contract Start Date:
12/01/2023
Contract End Date:
11/30/2024
Current Contract Value:
$301,000
Expenditures:
$58,372

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Eric Berntsen Kalispel Tribe Yes Technical Contact eberntsen@kalispeltribe.com (509) 447-7185
Jason Connor Kalispel Tribe Yes Contract Manager jconnor@knrd.org (509) 447-7285
Thomas Delorenzo Bonneville Power Administration Yes Env. Compliance Lead tdelorenzo@bpa.gov (503) 230-4419
Heidi Haak Bonneville Power Administration No CO Assistant hlhaak@bpa.gov (541) 922-6856
Andy Johnsen Kalispel Tribe No Technical Contact AJohnsen@KalispelTribe.com (509) 671-1298
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Kendra Maroney Kalispel Tribe Yes Interested Party kmaroney@kalispeltribe.com (509) 671-2376
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance B: 165. Obtain Required Permits from State or Federal Agencies as needed 11/30/2024
Effective implementation management and timely contract administration C: 119. Manage and Fulfill all Administrative Tasks 11/30/2024
Completed Annual Report D: 132. Submit Progress Report for the period Dec. 2020 to November 30,2021 11/30/2024
Coordination within the Columbia Basin. E: 189. Coordination with Other Entities on Restoration Actions & Efforts in the Basin 11/30/2024
Ensure coordination within Pend Oreille and Priest Subbasin F: 191. Coordination within the Pend Oreille and Priest River Watersheds 11/30/2024
Updated Strategy for Protection and Improvement of Native Salmonid Habitat G: 115. Update the Strategy for Protection and Improvement of Native Salmonid Habitat in WRIA 62 07/01/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Obtain Required Permits from State or Federal Agencies as needed
C 119 Manage and Fulfill all Administrative Tasks
D 132 Submit Progress Report for the period Dec. 2020 to November 30,2021
E 189 Coordination with Other Entities on Restoration Actions & Efforts in the Basin
F 191 Coordination within the Pend Oreille and Priest River Watersheds
G 115 Update the Strategy for Protection and Improvement of Native Salmonid Habitat in WRIA 62 10/03/2023